    论线状工程地质灾害预防应对问题

    Research on the prevention and response of geological hazards along linear engineering

    • 摘要: 线状工程地质灾害预防应对工作要考虑工程全寿命周期的安全问题,具体划分为规划选线、设计施工和工程运营三个阶段分别考量并制定针对性对策。规划选线阶段主要是规避地质灾害风险,设计施工阶段主要是采取工程措施预防可能遭遇或引发的地质灾害,工程运营阶段主要是监测预警和高效处置可能发生或正在发生的地质灾害。

       

      Abstract: The prevention and response of geological hazards in linear engineering projects must consider safety throughout the project’s lifecycle. This involves specific strategies tailored to three distinct stages: planning and route selection, design and construction, and project operation. The planning and selection stage focuses on avoiding geological disaster risks. In the design and construction stage, engineering measures are implemented to prevent geological hazards from occurring or triggering. During project operation stage, the emphasis shift to monitoring, early warning, and efficient management of ongoing or potential geological hazards.

       

    /