ISSN 1003-8035 CN 11-2852/P

    基于物理模拟试验的黄土高填方场地裂缝发育过程分析

    Analysis on crack development in loess deep filled ground based on physical modelling test

    • 摘要: 裂缝是高填方工程中常见病害,常规手段难以精准预测裂缝的发育情况。为指导黄土高填方工程的抗裂缝设计,以陕北某黄土高填方工程中的典型沟谷断面为原型,采用土工离心模型试验预测黄土高填方场地潜在裂缝,结合现场监测方法,揭示裂缝产生机制,并调查分析工程场地内裂缝的孕裂环境、启裂条件、破裂过程,评估离心模型试验预测裂缝发育的有效性,提出适用于黄土高填方场地的裂缝防控措施。离心模型试验结果显示,不均匀沉降、水平位移会引起沟谷地形中的黄土高填方场地在挖填交界带内发育裂缝;离心模型试验与原型现场监测结果显示,原型与离心模型试验的裂缝分布位置相对应,填土厚度差异引起的不均匀沉降和朝向沟谷中心的水平位移产生的拉剪联合作用是裂缝产生的主要原因。

       

      Abstract: Crack is a common disease in deep filled ground, and it is difficult to accurately predict the development of crack by conventional means. In order to guide the anti-crack design of loess deep filled project, the typical gully section of a loess deep filled project in northern Shaanxi is used as the prototype, the geotechnical centrifugal model test is used to predict the potential cracks in loess deep filled ground, and the mechanism of cracks is revealed by combining with the field monitoring method. Investigate and analyze the fracture environment, fracture initiation conditions and fracture process in the project site, evaluate the effectiveness of centrifugal model test to predict fracture development, and put forward the crack prevention and control measures suitable for loess deep filled ground. The results of centrifugal model test show that uneven settlement and horizontal displacement will cause cracks to develop in the boundary zone of excavation and filling of loess deep filled ground in gully terrain. The results of centrifugal model test and prototype field monitoring show that the crack distribution positions of the prototype and prototype model test correspond to each other, and the joint action of tensile shear caused by the difference of fill thickness and horizontal displacement toward the center of the gully are the main causes of the crack.

       

    /

    返回文章
    返回